Save Energy Save Energy
HomeAbout UsProduct InformationApplicationsPhoto/VideoContact UsLatest News
[ Welcome to S&N Airoflo ]

Oxidation Ditch Facilities Worksheet

Design Application Data for Oxidation Ditch Facilities

Project Name:
Location:

Engineer:
Contact Name:
E-Mail:
Company:
Address:
City:
State:
ZIP:
Phone:
Fax:

Owner:
Owner Name:
E-Mail:
Company:
Address:
City:
State:
ZIP:
Phone:
Fax:

Section 1: Wastewater Characteristics

Influent (mg/l)
BOD5:
TSS:
TKN:
Effluent (mg/l)
BOD5:
TSS:
NH4-N:
Mo. Ave. NPDES Limit (mg/l)
BOD5:
TSS:
NH4-N:
System Flow Data (mgd)
Design:
Average Daily:
Peak 2-hour:

Section 2: Electrical Data

Voltage:
Phase:
Hertz:

Existing Equipment Type:

Existing Equipment Type:
Existing HP:
Deisgn HP:
Does the system meet compliance parameters?


clear.gif clear.gif
Section 3: Basin Geometry
Please provide engineering drawings of the system which show obstructions, existing equipment, walkways, influent and effluent piping and structures, etc. Otherwise please provide the information below. You can upload a .jpg or .pdf file only.

Upload Drawings
File 1:
File 2:
File 3:

Legend:
A overall length of ditch
G - width at waterline
B - overall width of ditch
H - width of ditch at bottom
C - length of center wall or island
I - top of wall to bottom of ditch
D - width of center wall or island
J - depth at waterline
E - width of ditch channel
K - slope of wall (1:1, 1:2, etc.)
F - radius at ditch end
L - wall thickness

oxidation_ditch.jpg
Dimensions
A
B
C
D
E
F

oxidation_ditch_1.jpg
Dimensions
E
G
H
I
J
K
L

oxidation_ditch_2.jpg
E
G
H
I
J
K
L

oxidation_ditch_3.jpg
Dimensions
E
I
J
L


What color is this x? (select below)
Spam Question:





Copyright 2011 S&N Airoflo, Inc. All rights reserved. site by chris alford
spacer.gif